ULOG #014: Just Another Day With Pipes
Hello steem world! This is our 3rd day at MEPFS Department, our second to the last day for this. Early in the morning, we immediately went to tower 5 for checking.
Here you can see the pumpcrete going through the floors up to the roof deck. It is used for, of course, for concreting.
We also saw the progress of the stairs in my last post. It has a concrete slab already!
We then went to the 4th floor of the tower because we need to check the surveyed area.
Upon arriving, we noticed that the dowels were not aligned to the survey! It was a disaster waiting to burst.
We double checked and measure the area.
The supervisor realized that the plan used by the surveyor is different from his plan. So he instructed the surveyor to recheck and ask if what is the right plan. Moving on, we went. To the ground floor of the tower again for checking
Then, we went to the 2nd floor for supervision of the workers and I took a shot of the beautiful sky with the crane.
Then we went to the other side of the basement, the lower one. It was like in a tunnel with lots of treasure haha.
And this is the panel board of the side elevator of the building
So basically that is all for today. Thank you for reading!!
Congratulations @collenedesilva! You have completed the following achievement on Steemit and have been rewarded with new badge(s) :
Award for the total payout received
Click on the badge to view your Board of Honor.
If you no longer want to receive notifications, reply to this comment with the word
STOP
Do not miss the last post from @steemitboard:
SteemitBoard World Cup Contest - Play-off for third result
Participate in the SteemitBoard World Cup Contest!
Collect World Cup badges and win free SBD
Support the Gold Sponsors of the contest: @good-karma and @lukestokes