Building Site - Reconstruction
Reconstruction of the mini building continued today. There was just a minor work done and the Carpenters didn't show up.
Another worker was there to breakdown a part of the structure. This part was the previous piller in front of the pavement which was regarded as a little sit out prior to this reconstruction.
After the addition of the extended piller, this previous piller was found to be irrelevant and an obstruction to passage, hence need for removal.
This is what was done today. A huge hammer was used to remove the blocks and an iron saw was applied to chisel out the rods inside.
You can now see from the photos there is more space within. The sit out has now gotten more space.
Sort: Trending
[-]
successgr.with (74) 4 days ago