WSP : Construction Progress Report from Water System and Public Latrine [February 13, 2022]

in STEEM FOR BETTERLIFE3 years ago
Note: 50% of Rewards to accelerate the construction of the Water System and Public Latrine @worldsmile account

image.png

Construction Progress Report from Water System and Public Latrine

The achievement of construction progress from the water system and public latrine right on today, February 13, 2022, has reached 85%, where of the 11 construction work items from this construction, only 3 main work items are being worked on, on average the work items are being worked on, both separately or at the construction site. The roof of the building is already at the painting stage in the welding workshop while other work items carried out at the construction site are finishing painting and installing clean water installations. Meanwhile, the electrical installation will be carried out after the roof is installed on the building.

This is the achievement of the construction progress of the water system and public latrine which has reached 85%, to be clear about the condition of this progress, donors and other steemians can see the work item table and the current condition table of the water system and public lantrine construction such as below this:

Table of the main types of work from the construction of the Water System and Public Latriner
NumberType of workNotes
1.BouwplankComplete
2.FootingComplete
3.SloofComplete
4.ColumnComplete
5.BeamComplete
6.WallComplete
7.FloorComplete
8.Water TubComplete
9.RoofAlmost Complete
10.PaintingAlmost Complete
11.Electrical and Water SystemAlmost Complete
Design of Water System and Public Latrine Construction
image.png
Progress of Water System and Public Latrine Construction
PerspectivePresent Condiition
Front Viewimage.png
Front and Right Viewimage.png
Front and Left Viewimage.png
Right Viewimage.png
Left Viewimage.png
Back Viewimage.png
Back and Right Viewimage.png
Back and Left Viewimage.png
Water Tubimage.png
Latrineimage.png
Roofimage.png

This is a construction report related to the construction of the Water System and Public Latrine to all donors of the World Smile Project, especially to the steemit team through @steemcurator01 and @steemcurator02 who have provided support so far, I have done this construction report in accordance with technical analysis prevailing in Indonesia.

MAIN INFORMATION FROM WORLD SMILE PROJECT
Project NameWater System and Public Latrin
BeneficiaryKumbang Village Community
AddressSyamtalira Aron, North Aceh - Indonesia
Mapwhat3words.com

Related Links


Note:


  • Construction progress reports are in accordance with technical analysis
  • Financial Report will be submitted by other WSP team
  • All documents have been authorized by the relevant parties
  • Documents in the form of photos or writing must have permission from World Smile Project team

Cc : @pennsif @el-nailul @heriadi @irawandedy @miftahuddin @sofian88 @mariana4ve @bien

Thanks
@klen.civil


cropped_image (1).png

Sort:  
 3 years ago 

Осталось совсем немного! Поздравляю!

 3 years ago 

Laporan sangat bagus dengan capaian kemajuan yang akurat detail dan terupdate bukti transparansi yang sangat baik :)

 3 years ago 

Wah udh selesai ya pembangunan nya, warna nya keren. Thanks for.update 😊

 3 years ago 

Tinggal menunggu pemasangan atap kak

 3 years ago 

Oh yaya..ntar biru jg ya atap nya

 3 years ago 

Ya atap ny biru juga
hehehe

 3 years ago 

👍👍

 3 years ago 

😇😇