loop-manager (43)in #sct • 5 years ago • NonePig arrived.loop-manager (43)in #sct • 5 years ago • NonePower onFinally, we got the power for jetty system. System will be ready and we'll reach the goal.loop-manager (43)in #sct • 5 years ago • NoneRoad no. 30We are running on road no. 30 through the dark every in the morning. I hope all the work in safety and coming back to sweet home.loop-manager (43)in #sct • 5 years ago • NoneParm Tree over the painting.I found beautiful painting art in the immigration office. Live parm tree really matching with Kuwait tower and fishing…loop-manager (43)in #sct • 5 years ago • NoneFolder preparationThe preparation of folder is the first step for loop test activity and it is very essential. Required…loop-manager (43)in #sct • 5 years ago • NoneLoop TestLoop test is a pre-commissioning activity and last step before commencing the commissioning of system or plant. It…loop-manager (43)in #sct • 5 years ago • NoneHousekeeping [Photo]We are doing daily housekeeping to maintain our working area clean and safe.loop-manager (43)in #sct • 5 years ago • NoneDatesUnder the piercing sunshine and the steaming hot wind, the dates are ripening. Photo from Korean guest house in Khiran, Kuwait.loop-manager (43)in #sct-en • 5 years ago • NoneTeam building - We are the best.We are here to complete the best project in Kuwait. I think it's the best team i've ever worked on. Thanks to everyone on the team.loop-manager (43)in #sct • 5 years ago • NoneDon't forgetWe need to use proper tools for all activities. Improper tool using will result in cost and schedule impact. Above…loop-manager (43)in #sct • 5 years ago • NoneTK3Loop tests are on-going and we are using TK3 micrometer for axial vibration simulation.loop-manager (43)in #sct • 5 years ago • NoneProtection is required.Network cable laid without protection. It could be damaged easily even indoor. Need to be rectified.loop-manager (43)in #sct • 5 years ago • NoneTestSystem will be ready in some days.