Working together to complete the construction work.
Mobile Photograhy
Whenever there is any work, we all complete it together but it takes about 3 to 6 hours to complete the task because there is so much work that everyone has to do it thoughtfully.A mistake can cause a lot of loss, because after making mistakes in it, there will be only loss, that is why it has to be done diligently.I found out that it requires 11 people, so I brought 12 people and told everyone that I want you to complete this entire work.He was started to work at 9:00 AM but all the work was completed by around 4:00 PM in which he tried to take rest twice or thrice because rest is most important The heat of the day troubles us all day long, so we should always work thoughtfully so that our health is not affected and the work is also completed.
There was a guy who got sick and was vomiting because I think he drank too much water repeatedly.His stomach got upset because he drank water after eating samosa. He should have gone home and drank water but now he is feeling better so he has been told to go to one side but the wages are his.It is a matter of concern that when we are involved in some work, the other person does not always harm us but in front of illness we cannot do anything, so I always think that it does not matter.Expenses are not always talked about because he ordered sweets twice and the third time he ordered samosas and cold drink and after eating them he said that yes, now he has got some treat.Everyone cannot function without eating. He needs a little something or the other because he knows that he cannot do as per his wish.
Photos captured by | @ahlawat |
---|---|
Camera Device | nothing |
Lens | Default |
Category | Nature, Photography, Flowers, Animals, Birds |
Location | India |
Edited | Captured one |
I hope you like this. | You are all welcome.how are you my dear friends. |