Jamuna Bridge: Two eras of history and a modern rail bridge

in Steem For Lifestyle2 days ago
20250823_110413-COLLAGE.jpg

I am presenting to you the largest bridge to enter North Bengal. We travel through the largest bridge in North Bengal. When I go home and what is at home, I have to cross this Jamuna Bridge. Because today I have to cross the Jamuna River to go home. There is no alternative.

This Jamuna Bridge was opened in 1998. The length of this Jamuna Bridge is 4800 meters. Of course, it is one of the largest bridges in Bangladesh. Many cars travel here every day. The daily toll/money collected is about three crore taka. Source

I found in one information, daily vehicles travel on this Jamuna Bridge about 50 thousand. But it could be a little more or less than this. So the toll plaza can collect a lot. If I show you the calculation, you will see:-

No.List of vehiclesToll (money)
1Motorcycle50
2Car/Jeep550
4Big bus 32 seats or more1000
5Small bus 31 seats or less750

IMG_20250821_162525_968.jpg

I went home for two days of leave. This picture was taken when I was coming back to Dhaka after staying at home for two days.

While arriving, S.Travel's Bus 🚌 was calling, come on, brother, come on, we will leave quickly. After leaving, they just said that our car will leave very quickly because we have a reserve at around 8 pm. So our car will leave quickly, we will only take a few passengers to collect toll/money and then leave.

IMG_20250821_162516_412.jpg

After getting into the car, I waited for a maximum of 25 minutes, then they let me go. I sat inside the bus for these 25 minutes and went outside to eat ghol. Another famous food of Sirajganj is ghol.

Screenshot_20250823-151018.png

The price of 500 mg of ghol was 50 taka. That is, the price of one liter was 100 taka. It was very hot. And at that time I got ghol. My body got cold, because it was very delicious to eat. I have put your location here so that you can come here and you can also eat ghol from that place.Location

IMG_20250821_170358_530.jpg

The bus left for Nabinagar. If two of them find a passenger from a big stand somewhere, they pick him up. Because the bus is completely empty and has left to reach its destination with a few passengers.

I reached in front of the Jamuna Toll Plaza. Let's watch a little video of the Jamuna Bridge. Okay, so before that, let's take a look at the toll plaza when entering the Jamuna Bridge.

⏺️📷 Toll fee video👇

Every car comes here serially and each car pays its toll fee to get on the bridge. The bus goes through one lane and the truck goes through the other lane. We paid a toll fee of 1000 taka while going to get on the Jamuna Bridge.

IMG_20250821_164251_875.jpg

Now we went on the bridge with the bus. Then we could see that a big Jamuna Railway Bridge has been built on our left side as we were walking through the Jamuna Bridge. Now I will share one of my posts with you, you will see that the construction of this railway bridge was going on a year ago. The Diary Game || 16 Apr 2024 || Travel on the roof of the train

So you can say that it has been a year but where did the train travel before? The bridge we are crossing is the same as the 20th tour, that is, the train used to travel on one side of the same bridge and the buses used to travel on the other side.

Since this bridge is more than two decades old. Therefore, there are rickshaws during the movement of the train. Also, the train runs at a slow speed. Due to which the passengers lose a lot of time.

Alhamdulillah, now the train crosses the newly built bridge at a much faster speed on the opposite side. Now there is no rickshaw and no waste of time.

IMG_20250821_164516_681.jpg
IMG_20250821_164706_817.jpg
IMG_20250821_164415_797.jpg
IMG_20250821_164446_879.jpg

It takes about 15 minutes to go by bus, sometimes even 12 minutes. If the car is in good condition and goes a little faster, you can cross in a short time.

I have also shared a picture of myself while I was traveling by bus. The bus was not going very fast. Even then, it was good, it took us 12 minutes to go from one side of the bridge to the other.

I recorded a short video while traveling by bus to show you that the bridge that was under construction a year ago is now complete and trains are running.

Rail bridge under construction a year ago👇

IMG_20240416.jpg

Currently operational railway bridge 👇

IMG_20250821_164436_4.jpg

Today I am finishing up with you. But before that, I have shown you the location of this Jamuna Bridge below :-)

⏺️📷I recorded a little video while riding the bus across the bridge.👇

Sort:  
 2 days ago 

Your PIN is not set in steem atlas. Please pin the post to the steem atlas map.

 yesterday 

আমি এটি কারেকশন করে ঠিক করে দিচ্ছি।

TEAM - 02


Congratulations!! Your post has been upvoted through steemcurator04. We encourage you to publish creative and high-quality content, giving you a chance to receive valuable upvotes.
Curated by: chant

 yesterday 

@chant sister , Thank you so much for your valuable support 💖 💕