Better Life Diary Game ||| 07.03.2025|| Friday my busy time with office Work.
AssalamuAlaikum
Today is Friday
February 7 , 2025
@mdyousufali 🔷Form Bangladesh🇧🇩

Hello Steam Followers I hope you are all doing well and by the grace of Almighty Allah, I hope everyone is having a beautiful day through the fasting of the holy month of Ramadan. Starting you today before today the seventh Ramadan of the office is going away. March 2025 with this. There is a speech of Bangabandhu Sheikh Mujibur Rahman on March 7 but the current situation in the country. It is different, along with Bangabandhu's historical speech which we have read in Chittagong, it has now disappeared from the society. But anyway let's start with the morning. In the month of fasting, we perform Fajr prayer after Sehri. After that, without a little rest, I left for office around six in the morning because currently our office starts at six am.


Then we entered the office and saw the problem of a machine. Our office has three lux machines, that is, there is a water training problem in the watch cutter machine. If we have an office maintenance group, I share it in that group. Then within half an hour the maintenance group came to the office and participated in the machine repair work. Bluetooth is basically not doing water training because the pipe that is there for machine training is broken. So first of all they must not have understood today and then they removed the machine from there and brought it out. Identify the problem and fix it and then rerun it. Bangla Sex Limited actually I think the management department is very weak because they can't identify any problem very easily.


After that we came to the office and sent some yarn from the lab of yarn dye to us for testing. You cut them into the size of multi sarkar and then ate them with dalkhali means not like that. Then I put it in the sweet and let it dry for four hours and then let it dry. So after drying later we report it once for hacking. After generating the report, the next or output results. So there is a requirement outside of where you live, we do asset crediting accordingly. However, this is one of the things Young Dining Live is doing because they don't have enough equipment in their lab. Then they send it to them in writing and they do the next questions that way.

After this there is a workshop i.e. the manager of our laboratory is the senior manager. He will conduct a workshop with all the technicians of Khalad. To do this workshop, you basically have to set up a projector and then look for someone to set up the projector, but there was no one in our laboratory who could set up the projector in a minute. I can setup the projector myself. So I could do that myself. I took his laptop to the fifth floor. Then take a picture of the projector and tell sir that it is the projector. If you want, you can start the program here. Later sir took their Asian friends and started Workshop there.


Made some pies yesterday. He left the dry pitas saying that he will bring milk from the market today and fry the pita in milk. But unfortunately, the demand for milk at present is more than sufficient. So why not pay attention to the packet of arang milk that we can buy from the grocery store. So they brought 500 mm from there and then soaked it with friends. And later make it suitable for Iftar and then Inshallah. This is how I spent my whole day today everyone stay well stay healthy.
Thank You EveryOne
Sort: Trending
Loading...