The Diary Game||Date:29-05-2025||I worked all day on an electrical fault at a 33 kV substation.

in Steem For Bangladesh6 days ago

Steemian Friends,
Today, I will write in my diary, dated May 29, 2025. I will share with you the parts of my daily work through writing a diary. I hope everyone will like my diary writing.

IMG20250529114847.jpg
Thumbnail Photo(33 KV electrical fault working time)

Today, I woke up at 5:00 am to a call from the office on my mobile. I realised there was a fault in the electrical substation room when I received a call from the mobile number of the electrical control room. After I received the mobile, I discovered that there was an electrical shock circuit in the electrical substation room. After a lightning strike in the sky, a fault occurred at the electrical substation. I quickly left for the office. I couldn't go to the office because it was raining heavily after I left the house. I hired an autorickshaw, reached the office, and went to the electrical substation room. I began the process of locating the fault in the electrical substation room.

IMG20250529114659.jpg
Part of the blown 33 kV VCB

Due to a lightning strike, a section of the 33 kV high-tension electrical line was blown up. I started working with my electrical team. I isolated the faulty electrical component and began providing power to the remaining parts. After working for about two hours, I offered the production unit with a power supply. Then, I started working on the electrical faulty part. While performing electrical work, the project was being disrupted by rain. Then we continued working in the rain.

IMG20250529114840.jpg
33 KV electrical fault working time

I eat lunch around noon and take some rest. I feed and water my broiler chickens in between work. From today, I have to work on the electrical fault section and restart it. I first find the damaged electrical devices. I send the broken electrical devices to the office store department. The store department will purchase new electrical devices for us. It will take three days to provide an electrical supply to the remaining faulty substation.

IMG20250529125803.jpg
My broiler chickens

I work at the electrical substation until 8:00 PM. Some other small devices break down at the electrical substation, which we work all day to repair. Two or three times a year, such major faults occur at the electrical substation. I recall that last year, due to an electrical fault, I had to work from the office for three days to restore power. At 9:00 PM, I left the office for home.

IMG20250529184009.jpg
List of broken electrical appliances

I went home and took some rest. Then, I started writing a blog on the Steemit platform. I submitted the blog at 10.30 pm. Then I had dinner at midnight and went to sleep.