The Diary Game||Date:02-04-2025||On the fourth day I did important electrical maintenance work.
Steemian Friends,
Today, I will write my diary game dated 02-04-2025. I will share with you the parts of my daily work by writing a diary. I hope everyone will like my diary writing.
My Thumbnail Photo(I am in front of the oil filter machine)
Today, I woke up at 7 a.m., took a shower, and prepared to go to the office. I reached the office at 8 a.m. and started the fourth day of electrical maintenance work. Today, I started working on chemical earthing first. For chemical earthing, I dig ten feet underground. A GI pipe is placed deep in the soil, and an earthing chemical is given. I recommend earthing chemicals.
During electrical chemical earthing
I have used a few other earthing chemicals before on various electrical panels and have had success. After using an earthing chemical, water should be given every few days. A ten-foot-long copper rod (16mm dia) is placed inside the GI pipe. A hole is made in the head of the copper rod, and a cable joint is made that connects to the electrical panel. But today, only GI pipe installation work is done. Currently, earthing chemicals are very popular in electrical work.
During electrical chemical earthing
After finishing the DC motor maintenance for the last two days, I started the fittings today. I inserted the rotor coil inside the field coil and completed the motor fittings. A DC motor is very large, so an overhead crane is required for motor fittings. We have to be very careful while doing the DC motor fittings, as a small mistake can cause damage. I completed the entire work with my electrical team.
While fitting the DC motor
Today, I am showing below a video tutorial on how to make fittings after the maintenance of a DC motor. Today, I split maintenance with my electrical team into two parts. I supervise the maintenance work. I have been successful in maintenance work so far. I make a schedule for the maintenance of electrical appliances every six days. As an electrical engineer and head of the electrical department, I am responsible for completing the maintenance within the specified time.
My Youtube Link(While fitting the DC motor)
Then, I started to filter the oil of the 2MVA transformer. Filtering transformer oil is very important. For the dry electrical strength test, transformer oil is collected before filtering and oil after filtering. A dry electrical strength report of oil is very important. I checked the temperature settings for the oil filter. I filtered the transformer oil after about three hours.
While filtering the oil of 2MVA transformer
Then, in the afternoon, I leave the office and walk about two kilometres. My office colleague and I went out for a walk. Every afternoon, we leave the office and go for a walk to do physical exercise. The doctor advised me to walk for an hour every day. Then I go home in the evening and rest for some time. Then, I write and submit a diary blog on the Steemit platform. I had dinner at 11:00 p.m. and went to sleep.
This is my Twitter share link :
https://twitter.com/mahadih83660186/status/1908549866810466472?t=uWZEwwE-GQ9SZfulauVung&s=19
Hi, Greetings, Good to see you Here:)
Thank you very much for sharing a beautiful article with us. Hope you stay active and keep engaging with everyone. Join our Discord servers for help. Click the link below to join our discord server. https://discord.gg/6by5BAtAAC