Smithy Shop, Saidpur Railway Workshop
How are you all? I hope you are all well. I am well by the grace of God. I send you all my love and best wishes from the bottom of my heart. Today I have come to tell you about the Kamalshala Sop of the largest railway factory in Asia, the Saidpur Railway Factory. You will like it. Let's get started.
![]() |
---|
A very important part of the railway factory is the blacksmith shop, where important installations such as railway switches, coal, railway scheme, bread blocks, etc. are manufactured, which are added to the railway fleet.
![]() |
---|
These railway employees endure the heat of fire to make many parts that they have to work hard to make. These machines are made by melting iron and burning it in fire. One of the two largest railway factories in Bangladesh is the Saidpur Railway Factory.Here, all the tools are made by skilled workers.
![]() |
---|
The railway factory was built during the British era. Before this factory, iron was beaten into tools with hammers. In keeping with the modern era, the railway blacksmith shop has been set up in the electric shop. I have several electric hammers here.
![]() |
---|
This stove is basically powered by firewood, the firewood helps to light the fire. Iron is produced by burning it in the fire. There is a hobbi plate for beating the iron, it is beaten by placing it on the hobbi plate.
![]() |
---|
Then, springs were slowly made, and these springs were once part of the railway fleet and drove the cars with great power. Now, due to the shortage of manpower, not much work is done in this forge, but once upon a time, there was a lot of work, giving the employees a chance to catch their breath.
![]() |
---|
When the iron is taken out of the furnace, the iron is very hot. Such equipment is used to hold the iron, which turns into fire.We have seen farms outside but never seen such a big workshop, this snake is a national treasure of Bangladesh
![]() |
---|
These springs basically carry the load or carry the loot, all of these Kamarshal are a little unbearable for hot days, but a very comfortable place for winter.
![]() |
---|
The manpower allocation for Kamarkhali was 1200, but currently there are only 151 people here. It is safe to say that there are not many people. At one time, the factory was full of people. Now it is almost empty.
My YouTube video link-
I tried to show you a very important day for Bangladesh Railway Factory. May everyone be well and healthy. May Allah protect us until today.
Machine / Plant | Quantity |
---|---|
Hammer | 14 |
Furnace | 09 |
Spring & Chain Testing Machine | 04 |
Nut, Bolt & Rivet Forging Machine | 07 |
Gas Profile Machine | 03 |
Power Press | 12 |
Screwing Machine | 02 |
Grinding Machine | 04 |
Drill Machine | 04 |
Crane | 02 |
Blower | 02 |
Hydraulic Spring Buckling Press | 03 |
Hearth | 11 |
Others | 02 |
Total | 79 |
Component | Component |
---|---|
Swing Hanger | Swing Hanger Nut |
Drawbar | Screw Coupling |
Transition Coupling | Washer |
Rivet | Brake Beam |
Suspension Link Block | Suspension Link Shackle & Washer |
Crown Packing | Hose Pipe Clip |
Cages | Suspension Link Pin |
Pin | Cotter |
Bolster Safety Bracket | Brake Block "Key" |
Flap Door Spring | Chain Link |
Safety Loop | Door Hinge |
- [//] :# (!steematlas 25.792192 lat 88.889675 long Smithy Shop, Saidpur Railway Workshop d3scr)
Opening and closing hours 7 a.m.-4.30 p.m.