Smithy Shop, Saidpur Railway Workshop

in CCS7 hours ago

Assalamu Alaikum, peace be upon you.

Hello everyone

How are you all? I hope you are all well. I am well by the grace of God. I send you all my love and best wishes from the bottom of my heart. Today I have come to tell you about the Kamalshala Sop of the largest railway factory in Asia, the Saidpur Railway Factory. You will like it. Let's get started.

1000012523.jpg

cover photo

A very important part of the railway factory is the blacksmith shop, where important installations such as railway switches, coal, railway scheme, bread blocks, etc. are manufactured, which are added to the railway fleet.

1000012528.jpg

Blacksmith's tools

These railway employees endure the heat of fire to make many parts that they have to work hard to make. These machines are made by melting iron and burning it in fire. One of the two largest railway factories in Bangladesh is the Saidpur Railway Factory.Here, all the tools are made by skilled workers.

1000012533.jpg
1000012534.jpg
1000012535.jpg

Electric hammer

The railway factory was built during the British era. Before this factory, iron was beaten into tools with hammers. In keeping with the modern era, the railway blacksmith shop has been set up in the electric shop. I have several electric hammers here.

1000012532.jpg

Stove

This stove is basically powered by firewood, the firewood helps to light the fire. Iron is produced by burning it in the fire. There is a hobbi plate for beating the iron, it is beaten by placing it on the hobbi plate.

1000012531.jpg

Hebbi plate

Then, springs were slowly made, and these springs were once part of the railway fleet and drove the cars with great power. Now, due to the shortage of manpower, not much work is done in this forge, but once upon a time, there was a lot of work, giving the employees a chance to catch their breath.

1000012536.jpg

Used old parts for Hummer

When the iron is taken out of the furnace, the iron is very hot. Such equipment is used to hold the iron, which turns into fire.We have seen farms outside but never seen such a big workshop, this snake is a national treasure of Bangladesh

1000012527.jpg

spring

These springs basically carry the load or carry the loot, all of these Kamarshal are a little unbearable for hot days, but a very comfortable place for winter.

1000012526.jpg

Office

The manpower allocation for Kamarkhali was 1200, but currently there are only 151 people here. It is safe to say that there are not many people. At one time, the factory was full of people. Now it is almost empty.

My YouTube video link-

I tried to show you a very important day for Bangladesh Railway Factory. May everyone be well and healthy. May Allah protect us until today.

Machine / PlantQuantity
Hammer14
Furnace09
Spring & Chain Testing Machine04
Nut, Bolt & Rivet Forging Machine07
Gas Profile Machine03
Power Press12
Screwing Machine02
Grinding Machine04
Drill Machine04
Crane02
Blower02
Hydraulic Spring Buckling Press03
Hearth11
Others02
Total79

ComponentComponent
Swing HangerSwing Hanger Nut
DrawbarScrew Coupling
Transition CouplingWasher
RivetBrake Beam
Suspension Link BlockSuspension Link Shackle & Washer
Crown PackingHose Pipe Clip
CagesSuspension Link Pin
PinCotter
Bolster Safety BracketBrake Block "Key"
Flap Door SpringChain Link
Safety LoopDoor Hinge

location code

  • [//] :# (!steematlas 25.792192 lat 88.889675 long Smithy Shop, Saidpur Railway Workshop d3scr)

I am inviting three of my friends, @shamimhossain, @beny01,@rauja

Best regards

@ae-arfin