CHR Shop, Saidpur Railway Workshop, Saidpur
The largest railway factory in Asia is located in Bangladesh. This factory is located in Saidpur, Saidpur Upazila, Nilphamari District, Bangladesh. It has 101 seats and has 24 shops, one of which is the CHR shop.
![]() |
---|
Map Location Code Of CHR Shop, Saidpur Railway Workshop
Steem-atlas [//]:# (!steematlas 25.7911893 lat 88.8893616 long CHR Shop, Saidpur Railway Workshop d3scr)Google Map QVRQ+FPH Saidpur, linkhttps://maps.app.goo.gl/TekaaQeoZvwK1nZH6
Opening and closing hours 7 a.m.-4.30 p.m.
The full form of CHR is Carriage Heavy Repair.Passenger train repairs are carried out at the CHR shop. Passenger coaches are 90% serviced. Skilled workers at the CHR shop gradually activate these cars and bring them to service.This is a newly completed repair of the passenger coach's tollway and a quiz.
![]() |
---|
These coaches will gradually become active and passenger trains will run on these coaches and will run at high speed on the railway lines.These coaches are operated from different sections of the process steps. The workers in this factory complete the coaches automatically in specific steps.
![]() |
---|
All are looking for new plates being installed again. Once this installation is complete, the painting work will be done. There is a specific soap for painting. Paint soap.
![]() |
---|
The initial stage of painting has been completed. Once the painting is complete, it will be allowed to dry for a few days, and then the final painting will be done.Several steps are used to paint the cells, which results in the bright colors seen on the car.
![]() |
---|
Coach, after our entire process is completed, the toli is installed and the toli is repaired at the CHR shop.The entire process of a train starts step by step through the employees of this CSR shop. There are several sections with the sir, carpenter section, trolley section, under gear section, painting section, and labor sardar section, ten lighting section.
![]() |
---|
After the repair of this bogie tolly, the money will be fitted. The bogie will be on the wheels. The coach will be on the bogie.This will create a complete coach. Cranes are used to move these coaches from one place to another and place them on the trolley.The crane shop is responsible for servicing the cranes.
![]() |
---|
Cranes play a huge role in this project, and heavy lifting is done by cranes.This was my little idea about CHR Sop, may everyone be well and healthy until today, may Allah protect us.
I'm inviting my three friends @nayanay, @sati90,@trielsi
device -Tecno spark 20 pro
Wahh untuk pertama kalinya saya bisa melihat apa saya yang ada di bengkel kereta api, dan ini benar benar sangat menarik!
Terima kasih banyak atas komentar baik Anda.
$upvote25%
🎉 Congratulations!
Your post has been upvoted by CCS Curation Trail – a community powered by witness @visionaer3003.
“Home is where your heart is ❤️.”
👉 Join the CCS Curation Trail | Full Community Invitation
✅ Vote for @visionaer3003 as witness